The optimiser is the brain of an energy investment. How good it is can have a huge impact on your project’s financial performance.

There’s a healthy debate underway in the energy sector around where battery energy storage assets should be located within electricity systems, in order to create the greatest possible value, both for their owners and for society more broadly.
As a general rule, the further downstream storage assets are positioned within electricity networks, the greater the number of value streams they can access and so the greater the potential commercial return. The Rocky Mountain Institute has created a much-reproduced graphic which tells this story quite nicely and which you can find here.
One of the major benefits of batteries that are co-located with load – this is, installed behind-the-meter (BTM) at a home or business – is that they can reduce the owner’s exposure to transmission and distribution network costs remembering that network charges make up between 30% and 60% of a typical bill. These assets can still provide many of the ‘upstream’ services that front-of-the-meter (FTM) batteries typically target, such as wholesale market arbitrage, network support and frequency management, albeit with some additional wrinkles associated with market access, price signals and physical constraints.
By contrast, FTM storage can come in a number of forms, including co-located with solar and wind farms as a means of ‘firming up’ generation and/or providing the opportunity to sell into higher market prices, or as an alternative to building out the transmission network, but one use-case that’s got some momentum is the idea of storage directly connected to local distribution networks.
The principle is that these battery assets can provide localised network support – they offer an alternative and more flexible way of upgrading the LV network to support the changing needs of electricity distribution – and when not on network support duty can also be made available to market participants to capture market-related value. Importantly, there’s an argument that these assets can be larger and more cost efficient that their BTM cousins, at least relative to residential storage.
Pretty much every Distributed Network Service Provider (DNSP) in the world is looking at this opportunity, certainly all the Australian networks are, and a couple, Ausgrid in NSW and Western Power in WA have got as far as real projects (there might be some other live projects we’re not aware of). In the case of Western Power they’ve already got storage assets deployed out in the field.
There’s a fair bit of conjecture around whether a battery deployed FTM or BTM will deliver the greatest return. Often that debate is coloured by the natural biases of the parties involved – for example, you won’t be surprised to hear DNSPs argue that network connected storage will deliver a greater return compared to the same asset located behind-the-meter. They might be right, but it’s hard to take that opinion too seriously when most networks make their money by expanding their Regulated Asset Base (RAB).
To try and get past the rhetoric we thought we’d use the Gridcognition digital twin software to simulate BTM and FTM battery storage assets to see which might be able to capture the most value. As always for this kind of exercise we’ve had to make a number of assumptions in the modelling but we think the approach is reasonable based on actual projects we’ve been involved in.
For this exercise we’ve simulated BTM and FTM storage across six different scenarios, three in the Wholesale Electricity Market in WA (WEM) and three in the National Electricity Market on the east coast (NEM). The reason for this is that the two markets operate in very different ways and this has a significant bearing on how batteries can capture value. To keep the comparisons consistent we’ve compared the same sized battery assets in each scenario, but the same analysis could be run comparing one larger FTM battery with multiple smaller BTM batteries.
You can summarise these scenarios as follows:
The way the batteries are operated is obviously a hugely important part of the analysis and it’s easy to skew the results in a particular direction by tweaking which assets are chasing what value. In this case we’re mimicking the battery control approaches that we think are most plausible given the batteries’ locations. That means that our BTM assets are primarily focussed on reducing network charges, and then for the WEM assets mitigating IRCR charges and for the NEM assets providing contingency FCAS support. For our FTM batteries they are chasing wholesale market arbitrage and then for the WEM assets are capturing capacity credits and for the NEM assets again providing FCAS support. All scenarios require the battery to provide the network support services during spring and autumn as described above.
The graphic below shows the estimated cashflows relative to business as usual associated with each scenario over 12 months with the net position represented by the black reference line and label.
Overall, Scenario 5: WEM BTM + Solar delivered the greatest return of the six scenarios. The primary sources of value were the mitigation of IRCR costs and reduced network charges. The addition of a co-located solar PV system created a ‘peakier’ load shape by hollowing out middle-of-the-day grid demand which meant the battery could be more effective at reducing network demand charges. You can see the interaction of battery and solar in the graphic below which shows one week’s worth of data from the simulation
Of the FTM batteries, the asset located in the NEM was the comfortable winner with the difference coming from wholesale arbitrage. This isn’t a surprise given the NEM is a far more volatile and extreme energy market than the WEM. In terms of other value for FTM assets the contingency FCAS in the NEM delivered similar commercial benefits to Capacity Credits in the WEM.
Battery workload is often overlooked in conversations around storage projects, but just just like the battery in your laptop computer or mobile phone the lithium-ion batteries being deployed for energy storage projects degrade with use and over time. The harder the batteries are worked (frequency and depth of charge and discharge) and the longer they’ve been deployed in the field the less capacity they will have.
The dataset on real-world degradation is still very limited since the technology is so new, and so we’re obliged to rely on the tech specs from the battery vendors to guestimate how well and for how long a given asset might perform. A common way for battery vendors to warrant their products is by number of charge/discharge cycles or by total energy throughput. With this in mind we thought it would be interesting to view our hypothetical BTM and FTM assets through the lens of battery health, or in other words, how hard are the batteries having to work to create value.
The graphic below shows a full 12-months of simulated State-of-Charge for each battery together with the cumulative energy discharged (right hand axis with the annual total in red). What’s clear in this case is that the batteries chasing wholesale market benefit are working continuously as there’s are always arbitrage opportunities to be had. Those BTM focussed on network costs (+ IRCR (WEM) or FCAS (NEM)) undertake a fraction of the workload, with the BTM batteries co-located with solar working a little harder as there’s some solar self-consumption to take care of.
Hopefully this quantitative analysis of BTM vs FTM storage has provided some interesting insights for those folks grappling with the question of where best to locate storage assets. As I mentioned up front, we’ve replicated some specific real-world scenarios here to try and illustrate how value capture might play out, but the results are of course highly dependent on the assumptions we’ve made and, as is often the case with DER projects, the devil is in the detail.
Customer specific considerations such as market jurisdiction, network tariff structures, and for BTM assets the underlying load shape of the site, all have a significant bearing on the likely commercial performance. DYOR. Having access to a good tool for simulation and optimization of DER projects could help 😉
The optimiser is the brain of an energy investment. How good it is can have a huge impact on your project’s financial performance.
In this two-part post we’re looking at the commercial rationale for installing battery storage at a business premises.
Understanding Energy Storage Duration: BESS vs. Pumped Hydro and Market Impacts